Skip to main content
0

DIRECTIONS FOR APPLICATION

SWEEP

Clear away loose debris, sand, leaves, rubber duckies, etc. (you can leave the water). Instead of building a foundation for the repair, you’re clearing one off.

EZ STREET® Asphalt will adhere to anything solid in the pothole, but if it’s not fixed to the driveway, your repair won’t be either.
You’ll know it’s ready when there’s nothing loose along the edges, or bottom of the pothole for the repair to stick to.

FILL

When opening the bag, be careful not to cause any more damage than necessary to pour the asphalt out. You may want to use the bag later for storage.

If the crater’s deeper than three inches, it’s a good idea to fill in two inch layers, or “lifts”, compacting each layer before adding the next, to increase the density of the foundational layers.

Fill the pothole to just over the level of the existing pavement. Then…

COMPACT

If you don’t have a hand tamp, simply drive over the repair until it’s level with the driveway. And. That’s. It. It’s 100% okay to drive on an EZ Street asphalt repair immediately after completion—we call it “secondary compaction”.

Installation Video

Addressing a pothole in a residential or commercial driveway is straightforward with EZ Street AMBIENT® Asphalt Technology. Pour it directly from the bag, tamp it down with a shovel or vehicle tire, and use the same method for trip hazards on sidewalks. The fix is durable, lasting for years.

NOIR™ and NOIR™ Court are trademarks of Hold Court International, Inc. Miami, FL 33176
HOLD COURT International, Inc. 13611 S. Dixie Hwy, Suite 430 • Miami, FL 33176 • (305) 663-3090
©2024 Hold Court International